Posted by: tommyryan | March 9, 2009

Remodeling the basement – Part 1

Linda and I are in the middle of a remodel of our basement.  I started this with my Dad on 2/14 and have been chipping away at it each weekend since then.

Here is a short journal.  I have shared more pictures up on flickr.

Weekend 1 (2/14-15)

  • Put up walls (Thanks Ray Whitaker!)
  • Run wiring (did everything but connecting to the box)
  • First coat of ceiling paint (a spray gun is the only way to go with this)

Weekend 2 (2/21-22)

  • Hang Drywall (Almost broke my dad’s back with this task… he was a trooper!)
  • Put up blocking above the walls between the rafters
  • Wiring ceiling light cans
  • Final coat of paint on ceiling
Drywall is up!

Drywall is up!

Weekend 3 (2/28-3/1)

  • Finishing drywall (oh boy… this task is not hard, but VERY messy… dust everywhere)
  • Finishing wiring
Man this creates a mess!

Man this creates a mess!

Weekend 4 (3/7-8)

  • 1 coat of prime
  • 2 coats of Irish Tea paint
  • Preparing trim (painted the trim)
  • 3/4 of crown molding done
  • 2 coats of trim paint on window and door
Walls painted and trim around the pipes.  Lots-O miter joints.

Walls painted and trim around the pipes. Lots-O miter joints.

We are getting close, but probably have 3 more weekends of work.  We need to get up all the trim, install door and ventless heater, and lay carpet.  I will probably post after it is all done… maybe even do a video (we’ll see)…